Hold me. Kitchen renovations began this past weekend.
Here is the total list of what we'll be doing over the next 4-6 weeks or so:
- Demo (not drastic, but some) -- remove existing backsplash, remove all cabinet doors, remove all face plates, sand down rough wall patches/areas around face plates, and patch indentations on walls
- Add filler to gaps around crown molding and cabinet boxes
- Paint kitchen Martha Stewart Canvas
- Paint cabinet boxes and doors Glidden Indoor/Outdoor Extra-High Gloss Anitque White
- Add hardware to cabinets and drawers
- Apply finish to countertops (we're thinking this great multi-tonal concrete finish)
- Add backsplash (we're down to two!)
- Change light fixtures in main kitchen area
- Add lighting above and under cabinets